Basis for Recommendation
In relation to the planned preventative maintenance for the Class 8100 EMU Pantographs the regime was not robust enough to ensure that Pantograph 396 could operate without failure between overhaul periods.
back to recommendations listing
Ref # | 202105-01 |
---|---|
Status | Further Evidence Requested |
Occurrence | Overhead Line detachment, Pearse Station, 1st October 2020 |
Occurrence Date | 01 October 2020 |
In relation to the planned preventative maintenance for the Class 8100 EMU Pantographs the regime was not robust enough to ensure that Pantograph 396 could operate without failure between overhaul periods.
Iarnród Éireann Railway Undertaking, Chief Mechanical Engineer's Department should in conjunction with the Original Equipment Manufacturer (OEM) develop a maintenance regime for the pantographs, taking into consideration the operational conditions and traceability of safety critical components.