Basis for Recommendation
There was no quality control process within Iarnród Éireann Infrastructure Manager did not ensure the fog signals ordered were of the same specification as those received.
back to recommendations listing
Ref # | 2013-005 |
---|---|
Status | Closed |
Occurrence | Fog signal activation in Dart driving cab, Bray. |
Occurrence Date | 06 March 2012 |
Date Closed | 26/08/2022 |
There was no quality control process within Iarnród Éireann Infrastructure Manager did not ensure the fog signals ordered were of the same specification as those received.
Iarnród Éireann Infrastructure Manager should ensure that their procurement and quality control processes verify that fog signals received are of the correct specification as those ordered.